LATHROP, San Joaquin County — November 11, 2026. The nearly century-old steel truss bridge carrying Manthey Road across the San Joaquin River at Mossdale Crossing could eventually be removed after a replacement crossing opens farther downstream. The City of Lathrop held a public hearing scheduled for November 9, 2026, on the environmental review and proposed Manthey Road Bridge Replacement Project. A final council vote has not been independently confirmed by California58.
A 1926 crossing and a proposed $25.9 million replacement
The Manteca Bulletin reported November 7 that the existing steel truss bridge was built in 1926 and once had a moveable portion to allow boat passage. The described replacement would carry a reconfigured Golden Valley Parkway across the San Joaquin River downstream of the old crossing, in alignment with development planned for the River Islands area. The project was reported at approximately $25.9 million in the planning materials; it is not a verified final construction expenditure.
The replacement could change how drivers, emergency services, cyclists and pedestrians move through the corridor. However, details of the proposed design, construction schedule and the treatment of the historic structure must be established from the adopted project documents and relevant agency permits.
What the November 9 hearing was supposed to decide
The city's published legal notice dated October 22 scheduled a public hearing at 7 p.m. Monday, November 9, in City Hall Council Chambers, 390 Towne Centre Drive. The agenda included consideration of an Initial Study/Mitigated Negative Declaration, a Mitigation Monitoring and Reporting Program, and the bridge replacement project itself. A public hearing notice confirms an intended decision process; it does not prove the council adopted every staff recommendation.
Public questions that deserve answers
- What final decision, if any, did the council make November 9, and where are the adopted resolution and certified environmental review?
- Who will pay for the estimated $25.9 million project and what construction or right-of-way costs remain outside that estimate?
- What temporary river crossing or detours would serve residents and emergency vehicles while construction proceeds?
- Has the historic 1926 bridge been evaluated for preservation, relocation or documentation before possible removal?
- How would the new alignment affect pedestrian, bicycle and transit access, and what mitigation is binding?
The potential future Valley Link commuter rail connection discussed for the River Islands area should not be presented as a funded or operating rail station today. It is a separate long-term transportation concept that may affect how the corridor is planned.
Video and source material
The most useful video for local residents would be the actual November 9 hearing recording, a date-verified city engineer's presentation, or official site footage showing the old and proposed crossings. No exact YouTube ID from a verified Lathrop channel has yet been authenticated for this decision, so California58 has not attached unrelated bridge footage to the article cover.
Sources: City of Lathrop public hearing notice, published October 22; Manteca Bulletin, Dennis Wyatt, November 7; City of Lathrop official website. Residents or project officials can send meeting resolutions, corrections and original videos to California58. This article will be updated once the final council action is confirmed.
Support Lathrop News
Choose how to support Lathrop News:
Credit / Debit Card via StripeChoose your contribution amount on the secure California58 Stripe checkout. One-time support for independent local journalism.
Continue with PayPal Continue with ZelleZelle payments go to Vitaly Ataev Troshin. Please verify the recipient in your bank before sending. Availability depends on your bank.
Optional reader support. When possible, add “Lathrop News” to the payment note. Contributions are not advertised as tax-deductible. Support does not influence editorial decisions.More from Lathrop News
- Lathrop Council Election: Jefferson and Vicuña Lead Four-Candidate Race for Two Seats →
- Lathrop Mayor: Paul Akinjo Leads Minnie Diallo With 60.1% in Early Results →
- Lathrop’s 2026–27 Housing and Community Grants: What the City Listed—and Which Deadline Has Passed →
- Lathrop's 2026 Zoning Review Addresses ADUs, Parking and Drought-Friendly Landscaping →
- Moving to Lathrop? The City Lists a $150 Residential Utility Deposit and Required Documents →
COMMUNITY
Comments
Join the California58 conversation. You must be signed in to comment.
Create a free California58 account or sign in with an available social provider.